Bathroom Renovation - Maryland Fix & Flip
A Maryland buyer who walks into a bathroom with pink 1970s tile, a plastic tub surround separating at every seam, a vanity with swollen particleboard at the base, and a toilet that rocks on a softened floor – does not make an offer at ARV. They make an offer 10 to 20 percent below ARV, or they keep walking. Bathrooms are the rooms that end showings. A property can have a renovated kitchen, new flooring throughout, fresh paint, and new windows – and a single untouched bathroom will anchor the buyer’s entire perception of the property to the worst room they saw.
Fortune Homes MD approaches bathroom renovation on Maryland fix-and-flip properties from one angle: what is the minimum investment required to eliminate the bathroom as a negative, and what additional investment – applied at the right specification level – adds measurable ARV contribution. We do not recommend bathroom renovations designed to impress appraisers with luxury materials. We recommend bathroom renovations designed to remove objections, clear the lender’s inspection, and produce a space that the full buyer pool for that market will accept without discount requests.
Maryland’s fix-and-flip bathroom renovation market in 2026 has a clear profile. The mid-range bathroom renovation – new walk-in shower or tiled tub/shower combo, new vanity with quartz or cultured marble top, new toilet, new LVP or tile floor, fresh paint, updated fixtures and lighting – delivers 65-80% ROI and eliminates the bathroom as a buyer objection at most Maryland price points. Fortune Homes MD specifies and manages bathroom renovations for every property type in our Maryland service area: Baltimore City rowhouses with a single full bath, Howard County colonials with primary and two secondary baths, and everything in between.
This page covers the full scope of bathroom renovation for fix-and-flip investors: how to prioritize multiple bathrooms on a single property, walk-in shower versus tub decisions, tile specification discipline, vanity and fixture selection, the half-bath as a high-ROI quick win, and the full cost-by-scope breakdown for Maryland in 2026.
Bathroom Holding Your Listing Back? Fortune Homes MD Renovates It Right at the Right Spec Level. Free walkthrough | (410) 413-0739 | info@fortunehomesmd.com |
Prioritizing Bathrooms on a Multi-Bathroom Maryland Fix-and-Flip
Most Maryland fix-and-flip properties have two or more bathrooms. A common investor mistake is distributing the renovation budget equally across all bathrooms – producing a mediocre renovation in every bath rather than an excellent renovation in the highest-ROI bath and an adequate renovation in secondary baths. Fortune Homes MD recommends a prioritization framework:
Bathroom Type | Priority Level | Renovation Scope | ROI Contribution |
Primary/master bath | Priority 1 – Maximum investment | Full gut or near-gut renovation; walk-in shower; double vanity where space permits | 55-65% direct ROI; highest buyer perception impact |
Main-level full bath (shared) | Priority 2 – Full renovation | New tub/shower; vanity; toilet; tile floor; lighting – complete mid-range spec | 65-75% direct ROI; second most visible bath |
Secondary full bath (guest/hall) | Priority 3 – Mid-range renovation | Functional update: new vanity, toilet, tub surround, floor, paint, fixtures | 70-80% direct ROI on mid-range scope; removal of objection |
Half bath (powder room) | Priority 4 – High ROI quick update | New vanity, toilet, mirror, lighting, paint – complete transformation at low cost | 75-90% ROI; lowest investment, highest percentage return |
Basement bath (if present) | Priority 5 – Functional spec | Macerating toilet (if needed); basic vanity; functional tile; waterproofing focus | 50-65% ROI; functional value add; buyer bonus |
Maryland Multi-Bath Budget Allocation Principle: On a Maryland property with primary bath + one full bath + one half bath, Fortune Homes MD recommends allocating approximately 50% of the bathroom renovation budget to the primary bath, 35% to the full shared bath, and 15% to the half bath. This weighting reflects buyer behavior: buyers make their bathroom judgment primarily on the primary bath, use the shared bath as confirmation, and treat the half bath as a bonus. A spectacular primary bath + adequate shared bath + fresh half bath outperforms an average specification applied equally across all three rooms. |
2026 Maryland Bathroom Renovation – Cost by Scope and Bathroom Type
Full Bath – Mid-Range Renovation (Most Common Maryland Flip Specification)
A mid-range full bath renovation retains the existing plumbing rough-in location, replaces all surfaces and fixtures, and delivers a clean, buyer-accepted bathroom without the cost premium of full plumbing relocation. This is the right specification for secondary full baths and shared hall baths on most Maryland fix-and-flip properties in the $225,000-$500,000 ARV range.
Line Item | Detail | Maryland Cost Range |
Demo and haul | Remove tub/shower, toilet, vanity, flooring, drywall as needed | $700-$1,800 |
Tub/shower (tub with tile surround) | Alcove soaking tub; 3-wall tile surround; shower valve and fixtures | $1,800-$4,500 |
Vanity with top | 30-36″ single vanity; white shaker style; cultured marble or quartz top | $600-$1,800 installed |
Toilet | Elongated comfort-height white toilet; soft-close seat | $350-$650 installed |
Floor tile | Porcelain tile 12×12 or 12×24; slip-resistant; grout and waterproofing | $600-$1,600 |
Plumbing rough-in connections (same location) | Supply and drain connections; valves | $300-$700 |
Drywall, cement board, waterproofing | Greenboard or Hardibacker in wet areas; RedGard or Schluter membrane | $400-$900 |
Lighting and electrical | Vanity light bar; GFCI outlet; exhaust fan with light | $350-$800 |
Mirror, accessories, hardware | Framed mirror; towel bar; toilet paper holder; robe hook | $150-$400 |
Paint and trim | Two coats; semi-gloss finish; base trim | $300-$600 |
TOTAL – Mid-Range Full Bath | Retain existing layout; complete surface and fixture replacement | $5,550-$13,750 |
Primary Bath – Gut Renovation with Walk-In Shower
The primary bathroom is the highest-priority bathroom renovation on any Maryland fix-and-flip property above $300,000 ARV. Maryland buyers in the $350,000-$600,000 ARV range expect a walk-in shower – not a tub/shower combo – in the primary bathroom. A tile walk-in shower with a frameless or semi-frameless glass enclosure is the single specification decision with the greatest listing photo impact and buyer first-impression value in the primary bath.
Line Item | Detail | Maryland Cost Range |
Demo and haul | Full gut: tub, vanity, toilet, flooring, walls to substrate | $1,200-$2,800 |
Walk-in shower construction | Tile shower; linear or center drain; bench optional; Schluter or sheet membrane | $4,500-$12,000 |
Frameless/semi-frameless glass enclosure | Heavy glass door and panel; chrome or brushed nickel hardware | $1,500-$4,000 |
Double vanity (where space permits) | 60″ double vanity; shaker style; quartz top; two undermount sinks | $1,800-$5,000 installed |
Single vanity (smaller primary bath) | 36-48″ vanity; upgraded spec; quartz top | $800-$2,200 installed |
Toilet | Comfort-height elongated; upgraded vs. standard spec | $400-$800 installed |
Floor tile | Large-format porcelain 12×24 or 24×24; heated floor option | $900-$2,500 |
Plumbing rough-in (same location) | Supply and DWV connections; shower valve; thermostatic option | $600-$1,500 |
Plumbing relocation (if needed) | Relocate rough-in to accommodate new layout | $1,200-$3,500 additional |
Drywall, cement board, waterproofing | Full wet area waterproofing system; cement board throughout shower | $600-$1,400 |
Electrical: lighting, exhaust, GFCI | Recessed shower lighting; layered vanity lighting; exhaust fan with timer | $600-$1,500 |
Mirror, accessories, hardware | Frameless mirror or framed; upgraded accessories in chrome/nickel finish | $250-$700 |
Paint and trim | Premium semi-gloss; wall tile accent optional | $400-$800 |
TOTAL – Primary Bath Gut (walk-in shower) | Full gut; same layout; walk-in shower; double vanity where space allows | $13,050-$37,200 |
Primary Bath Walk-In Shower – The Single Highest-Impact Photo in Your Maryland Listing (410) 413-0739 | info@fortunehomesmd.com | fortunehomesmd.com |
Half Bath - High-ROI Quick Win
The half bath (powder room) is the highest-ROI bathroom investment per dollar on most Maryland fix-and-flip properties. It has no shower or tub – just a toilet and vanity – which means no waterproofing, no tile work beyond optional floor tile, and no shower valve or glass enclosure. A complete half bath transformation costs $2,500-$5,500 and produces the visual impact of a fully renovated bathroom in listing photos and showings.
Line Item
Detail
Maryland Cost Range
Demo and haul
Remove vanity, toilet, flooring
$300-$600
Vanity with top
24-30″ pedestal or shaker vanity; vessel sink or undermount; upgraded faucet
$400-$1,200 installed
Toilet
Comfort-height; white; soft-close seat
$350-$600 installed
Floor tile or LVP
Porcelain tile or waterproof LVP; small format or herringbone for visual interest
$250-$700
Lighting and GFCI
Modern vanity light bar; GFCI outlet; updated switch plate
$200-$500
Mirror and accessories
Statement mirror; paper holder; hook
$100-$350
Paint
Feature wall or full paint; semi-gloss
$150-$350
TOTAL – Half Bath
Complete visual transformation; no shower scope
$1,750-$4,300
Half Bath ROI – Maryland Investor Quick Win:
A half bath renovation costing $2,500-$4,000 on a Maryland fix-and-flip property typically contributes $4,000-$7,000 to ARV – an 80-90% direct return and one of the strongest percentage ROI investments in any residential renovation. The half bath also appears in listing photos and makes a strong first impression for guest use during showings. Fortune Homes MD includes half bath renovation in the scope recommendation for every multi-bath Maryland property where the half bath is currently dated or needs updating.
Walk-In Shower vs. Tub: The Most Consequential Maryland Flip Decision
The walk-in shower versus tub decision is the most consequential single-fixture choice in a Maryland fix-and-flip bathroom renovation. The stakes are different depending on the bathroom’s role in the home. In the primary bathroom, a walk-in shower is the right call for most Maryland ARV targets above $300,000. In a secondary full bath, retaining a tub is frequently the right call because families with young children and a segment of the buyer pool specifically want a tub for bathing – and a property with no tub anywhere is a harder sell in Maryland’s family buyer market.
Scenario
Recommendation
Reason
Primary bath; ARV $300K+; secondary bath has tub
Walk-in tile shower; no tub in primary
Maryland buyers $300K+ expect walk-in shower in primary; tub present elsewhere
Primary bath; ARV <$300K; secondary bath has tub
Walk-in shower or tub/shower combo acceptable
Both buyer-accepted at this price point; tub/shower combo is lower cost
Only bathroom in property (single-bath home)
Tub/shower combo required
Single-bath properties must retain a tub; FHA/VA buyer eligibility and family market
Secondary/hall bath; primary has walk-in shower
Retain or install tub/shower combo
Families with young children require at least one tub in the home
Primary bath; no secondary bath with tub
Walk-in shower + freestanding tub (if space; ARV $450K+)
Freestanding tub as design element; premium market only; space required
Rowhouse with single bath; Baltimore City
Tub/shower combo standard spec; no walk-in shower
Single bath; maximum buyer appeal; keep tub
No-Tub Property Warning – Maryland Market Impact:
A Maryland fix-and-flip property with zero bathtubs – walk-in showers in every bathroom but no tub – will face buyer objections from families with young children and may face appraisal questions in some markets. FHA and VA appraisers do not require a tub per se, but the buyer pool that uses FHA and VA financing includes a high percentage of families who will note the absence of any tub. Fortune Homes MD recommends retaining at least one tub (as a tub/shower combo) in a secondary bathroom on any Maryland flip where the primary bath gets a walk-in shower conversion.
Walk-In Shower or Keep the Tub? We Assess Your Specific Property and Make the Right Call.
(410) 413-0739 | info@fortunehomesmd.com
Tile Specification Discipline - The Investor's Guide to Maryland Bathroom Tile
Tile selection is the most common source of bathroom cost overrun on Maryland fix-and-flip properties. An investor who defers tile selection to a tile showroom without a specification budget ceiling will consistently come back with a tile selection that adds $3,000-$8,000 in material cost over the investor specification – because showrooms are designed to upsell, not to optimize for flip ROI.
Tile Application | Investor Specification | Material Cost | MD Installed Cost (labor + material) |
Shower wall tile | 12×24 porcelain; matte or satin; neutral white/gray/greige | $2-$6 per sq ft | $10-$18 per sq ft installed |
Shower floor tile | 2×2 or mosaic porcelain; slip-resistant; matches wall | $2-$5 per sq ft | $12-$22 per sq ft installed (more cuts) |
Bathroom floor tile | 12×12 or 12×24 porcelain; rectified; non-slip | $1.50-$5 per sq ft | $8-$16 per sq ft installed |
Tub surround tile | 4×12 subway or 12×24; 3-wall installation | $1.50-$4 per sq ft | $900-$2,800 full surround |
Feature accent tile | One accent row or niche; budget $100-$350 total | $4-$15 per sq ft (limited use) | Budget ceiling: $350 for accent |
LVP floor (non-wet areas) | Waterproof LVP; wood-look; run to shower threshold | $2-$5 per sq ft | $3-$7 per sq ft installed |
Investor Tile Selection Rule: Select neutral, large-format porcelain tile in white, light gray, or greige (warm gray). These colors photograph well, work with any paint color a buyer may choose, and are the least likely to generate a buyer objection based on taste. Avoid glass tile, natural stone, patterned encaustic tile, and any tile with a strong color or motif. Fortune Homes MD provides tile specification guidance for every bathroom renovation we complete – the goal is to eliminate taste as a variable in buyer perception. |
Vanity Specification for Maryland Fix-and-Flip Bathrooms
The vanity is the dominant visual element in any bathroom without a walk-in shower. It appears in the listing photo, takes up the largest single footprint, and is the item buyers most directly assess as a signal of overall renovation quality. The Maryland fix-and-flip market has a clear 2026 vanity preference: white shaker-style with a quartz or cultured marble top, undermount rectangular sink, and chrome or brushed nickel hardware.
Vanity Type | Maryland ARV Application | Cost Range (vanity + top, installed) | Notes |
24-30″ single (half bath) | All ARV ranges | $350-$900 | Half bath; pedestal or small shaker style; upgraded faucet |
30-36″ single (full bath) | <$350K ARV | $550-$1,500 | Mid-range spec; cultured marble or quartz top; soft-close |
36-48″ single (full or primary) | $250K-$450K ARV | $700-$2,000 | Larger single; drawer tower; quartz top; undermount sink |
60″ double (primary) | $350K-$600K ARV | $1,600-$4,500 | Two-sink primary vanity; buyer expected at this ARV range |
72″+ double (large primary) | $500K+ ARV | $2,500-$6,000+ | Premium specification; semi-custom or custom vanity |
2026 Maryland Bathroom Renovation - Summary Cost by Bathroom Type
Bathroom Type | Entry Scope | Mid-Range Scope | Full Gut Scope | ARV Contribution |
Half bath | $1,500-$2,500 | $2,500-$4,500 | $4,500-$7,000 | $3,000-$9,000 |
Secondary full bath | $5,000-$8,000 | $9,000-$16,000 | $16,000-$28,000 | $8,000-$28,000 |
Primary bath (tub/shower) | $8,000-$14,000 | $14,000-$24,000 | $24,000-$40,000 | $12,000-$38,000 |
Primary bath (walk-in shower) | N/A | $16,000-$28,000 | $28,000-$52,000 | $18,000-$48,000 |
Basement bath (functional) | $4,500-$8,000 | $8,000-$14,000 | N/A | $5,000-$12,000 |
Montgomery County and DC-metro area labor carries a 15-20% premium over Baltimore-area pricing. Plumber rates in Maryland run $85-$175/hour in 2026 (up 8-10% from 2025). Tile installer rates run $12-$22/sq ft installed. The 2026 national average bathroom remodel cost is approximately $16,500 with mid-range projects running $180-$280/sq ft. Plumbing relocation adds $1,200-$3,500 per fixture relocated.
Bathroom Renovation Permits in Maryland
Work Type | Permit Required | Maryland Cost | Processing Time |
Cosmetic only (vanity swap, paint, fixture swap) | Generally no permit | N/A | N/A |
New GFCI outlets or lighting circuit | Electrical permit | $75-$250 | 1-2 weeks |
Plumbing fixture replacement (same location) | Usually no permit (check county) | N/A or $50-$150 | Same day to 1 week |
Plumbing relocation (drain, supply) | Plumbing permit | $100-$300 | 1-3 weeks |
New bathroom addition | Building + plumbing + electrical permits | $300-$700 | 4-8 weeks |
Full gut remodel with plumbing + electrical | Combined building permit | $200-$500 | 2-4 weeks |
Bathroom Renovation Sequencing in a Maryland Fix-and-Flip
1 | SPEC AND MATERIAL SELECTION BEFORE DEMO: Tile, vanity, toilet, fixtures, and glass enclosure (if applicable) are specified before demo begins. Tile lead time, vanity availability, and glass enclosure lead time (typically 2-4 weeks for custom-cut glass) must be built into the project schedule. Starting a demo without materials confirmed and on order routinely produces a 2-3 week standstill between rough-in completion and finish work. |
2 | DEMO AND ROUGH-IN INSPECTION: Full demo to substrate. Plumbing rough-in and electrical rough-in completed in open walls. Waterproofing membrane applied to shower pan and walls before any tile work begins. Rough-in inspected and passed before the backer board or drywall goes up. |
3 | BACKER BOARD AND WATERPROOFING: Cement board or Wedi board installed in all wet areas. Schluter membrane, RedGard, or sheet-applied waterproofing on shower floor and curb. This phase is the most commonly skipped or shortcut item on bathroom renovations – and the most consequential. A failed waterproofing system produces mold, structural damage, and buyer warranty claims. |
4 | TILE INSTALLATION: Floor tile set after backer board and waterproofing cure. Shower wall tile set in sequence from bottom up. Grout applied after tile cure. Grout sealed after grout cure. Tile work is the critical path item in bathroom renovation – do not rush cure times. |
5 | VANITY, TOILET, FIXTURES, AND GLASS: After tile is grouted and sealed, vanity is set and connected. Toilet is installed and tested. Shower fixtures and valve trim are installed. Glass enclosure is installed after all tile work is complete and fully cured. |
6 | ELECTRICAL FINISH, LIGHTING, ACCESSORIES, AND PAINT: Vanity light bar, exhaust fan, GFCI outlets, and switch plates are finished. The mirror is hung. Towel bars, toilet paper holders, and accessories are installed. Paint is applied last – after all fixtures are in place, so touch-up scope is minimized. |
Fully Sequenced Bathroom Renovation – No Standstills, No Waterproofing Shortcuts (410) 413-0739 | info@fortunehomesmd.com | fortunehomesmd.com |
Frequently Asked Questions
A: Maryland bathroom renovation costs vary significantly by bathroom type and scope. A half bath update runs $1,750-$4,300. A mid-range secondary full bath renovation runs $9,000-$16,000. A primary bath gut renovation with a walk-in shower runs $16,000-$37,000+ depending on size and specification. Maryland’s 2026 average bathroom remodel cost is approximately $11,868, but fix-and-flip properties typically require full renovation rather than cosmetic updates. Montgomery County and DC-metro labor carries a 15-20% premium over Baltimore-area pricing. Fortune Homes MD provides a line-item estimate after a property walkthrough.
A: Mid-range bathroom renovations in Maryland deliver 65-75% direct cost-to-value ROI, consistent with national data showing 73.7% for mid-range bathroom remodels. The more useful investor metric is net margin contribution: a $15,000 bathroom renovation that adds $20,000 to ARV generates $5,000 in net margin. Half bath renovations deliver the highest percentage ROI (75-90%) at the lowest cost. Primary bath gut renovations with walk-in showers deliver strong buyer perception impact at 55-65% direct ROI – the listing photo value and showing-day impact are disproportionate to the pure percentage number.
A: The answer depends on the bathroom’s role and the property’s ARV. In the primary bath above $300,000 ARV, a walk-in tile shower is the right specification – Maryland buyers at this price point expect it. In a secondary full bath, retain a tub/shower combo because families with young children and a significant portion of the buyer pool want at least one tub in the home. Never remove all tubs from a property without understanding the impact on your buyer pool. If the primary bath gets a walk-in shower, the secondary bath should have a tub/shower combo. Fortune Homes MD assesses each property individually and recommends accordingly.
A: Large-format porcelain tile in neutral colors – white, light gray, or greige – is the correct specification for most Maryland fix-and-flip bathrooms. 12×24 porcelain for shower walls and bathroom floors; 2×2 mosaic for shower floors; 12×12 or 12×24 for bathroom floors. These colors photograph well, appeal to the broadest buyer audience, and are resistant to taste-based objections. Avoid glass tile, natural stone, patterned tile, or strong color choices. A $2-$6/sq ft neutral porcelain tile installed properly is indistinguishable from a $10-$15/sq ft premium tile in a listing photo. Fortune Homes MD specifies tile before demo and sets a material cost ceiling to prevent showroom upsell.
A: White shaker-style vanity with a quartz or cultured marble top, undermount rectangular sink, and chrome or brushed nickel hardware is the right specification for most Maryland fix-and-flip properties. Size the vanity to the bathroom and ARV target: 30-36″ single for secondary full baths under $350,000 ARV; 36-48″ single for primary baths under $400,000 ARV; 60″ double for primary baths targeting $350,000-$600,000 ARV where space permits. A 60″ double vanity in a primary bath is one of the most effective single-item upgrades for buyer perception in the $400,000-$550,000 Maryland market.
A: Waterproofing in the shower pan and wet wall areas is the single most critical quality item in a bathroom renovation – and the most frequently shortcut by low-bid contractors. A failed shower waterproofing system produces mold in the wall cavity, structural damage to framing and subfloor, and buyer warranty claims after closing. Fortune Homes MD installs Schluter KERDI membrane or equivalent sheet-applied waterproofing system on all shower pans and walls – not painted waterproofing products or simple cement board without membrane. Waterproofing is inspected before tile is set on every project we complete.
A: Permit requirements depend on the scope. Cosmetic updates (new vanity, toilet, paint, fixtures in the same location) generally do not require a permit in most Maryland counties. Plumbing relocation, new electrical circuits, and structural changes require permits. A full gut renovation involving plumbing rough-in, new GFCI circuits, and drywall work requires combined permits. Fortune Homes MD manages all permit applications and inspections. Unpermitted plumbing and electrical work creates disclosure obligations and lender issues at resale – the same issues that affect kitchen and HVAC unpermitted work.
A: A secondary full bath mid-range renovation takes 3-5 weeks from demo to completion. A primary bath gut renovation with a walk-in shower takes 5-8 weeks – the critical path items are glass enclosure lead time (2-4 weeks for custom-cut) and tile cure times (grout must cure 48-72 hours before sealing; sealer must cure before glass installation). Material selection and ordering must be completed before the demo begins to avoid standstills. Fortune Homes MD builds bathroom timelines – including material lead times – into the project schedule so the bathroom renovation does not delay the property’s final inspection date.
A: Allocate approximately 50% of your bathroom renovation budget to the primary bath, 35% to the main shared full bath, and 15% to the half bath (if present). This weighting matches buyer behavior: the primary bath drives perception, the shared bath confirms quality, and the half bath is a bonus. A strong primary bath renovation is more valuable than an average renovation distributed equally across all bathrooms. Secondary bathrooms at mid-range specification and the half bath at a full transformation provide a complete, consistent renovation story for a buyer walking the property.
A: Call (410) 413-0739 or email info@fortunehomesmd.com. We schedule walkthroughs within 3-5 business days. Our assessment covers all bathrooms in the property: current condition, plumbing rough-in locations, waterproofing status, priority ranking, and specification recommendation for each bathroom keyed to your ARV target. We provide a written line-item estimate for each bathroom scope within 5-7 business days.
Still have a question?
Related Renovation Services
Service | URL |
Kitchen Gut Remodel | /services/fix-flip/renovation-services/kitchen-gut-remodel/ – Same specification discipline for kitchen |
Complete Property Rehab | /services/fix-flip/renovation-services/complete-property-rehab/ – Bathroom integrated in full-property rehab scope |
Plumbing System Upgrade | /services/fix-flip/renovation-services/plumbing-system-upgrade/ – Supply and DWV rough-in coordinated with bathroom renovation |
Electrical System Upgrade | /services/fix-flip/renovation-services/electrical-system-upgrade/ – GFCI and exhaust fan circuits |
Curb Appeal & Landscaping | /services/fix-flip/renovation-services/curb-appeal-landscaping/ – Final step in complete Maryland fix-and-flip renovation |
Property Inspection | /services/fix-flip/property-analysis/property-inspection/ – Bathroom waterproofing and plumbing condition in every pre-purchase report |
A Bad Bathroom Ends the Showing. A Good Bathroom Closes the Sale. Walk-in shower – Double vanity – Tile work – Waterproofing – Half bath – All permits Specify your ARV target. Managed from demo to final fixture. All Maryland counties. (410) 413-0739 | info@fortunehomesmd.com | fortunehomesmd.com Serving: Baltimore – Montgomery – Howard – Anne Arundel – Prince George’s – Frederick – Carroll |